Ok, so today I got the inter cooler as plumed as far as I can. I need one more 90 to finish from the IC to the TB. Then its all good to go. Then once I get everything plumed I will take everything back off, and wrap the complete hot side to the exit of the engine bay. Once I have the hot side off I will wire everything up and HOPEFULLY I will have a running car. Oh, yeah! I should really start thinking about coolant hoses. And I need a place to mount my meth kit.
I may be pulling the motor out in the near future, since I did order the LS9 cam and the other stuff to go with it. So, that should get done while the hot side is off also. I will also be putting the 4th gen motor mounts with poly bushing at the same time. And, Im sure this wont be the last thing that I have to do, but I still need to get a drive shaft made for it.
One step forward, 2 steps back.
I will post some pic.s tomorrow. We all love pic.s!
I may be pulling the motor out in the near future, since I did order the LS9 cam and the other stuff to go with it. So, that should get done while the hot side is off also. I will also be putting the 4th gen motor mounts with poly bushing at the same time. And, Im sure this wont be the last thing that I have to do, but I still need to get a drive shaft made for it.
One step forward, 2 steps back.
I will post some pic.s tomorrow. We all love pic.s!


Comment